Manchester, Connecticut 06040
Welcome home to this inviting 4-bedroom, 2.5-bath Colonial in the desirable Walek Farms neighborhood, set on a spacious 0.64-acre lot. A BRAND-NEW ROOF was just installed, featuring a 50-year GAF warranty for added peace of mind. The bright, open floor plan is ideal for both everyday living and entertaining, offering hardwood floors and carpeting, first-floor laundry, and a cozy gas fireplace. The spacious primary suite features vaulted ceilings, a large walk-in closet, and a private full bath. Step outside onto the recently painted rear deck and enjoy the peaceful setting and generous yard. The full walk-out lower level offers approximately 930 square feet of additional potential-perfect for a home office, recreation room, gym, or future living space. An attached 2-car garage, natural gas heat, public water and sewer, and a convenient Manchester location complete the package. A wonderful opportunity to make this well-maintained Colonial your next home. Schedule your private showing today!
Manchester , Connecticut 06040
On market 2 days
30-year fixed. Includes taxes; estimates only.
Map location is based on the property address.
Listing information is deemed reliable but not guaranteed and is sourced from the local MLS feed. Brokerage shown: ERAV01.
Manchester, Connecticut 06042
Manchester, Connecticut 06042
Manchester, Connecticut 06040
Manchester, Connecticut 06040